TurbineGPB80D

Power7.4 MWe

Show product

Initial Situation

The system concept of Agfa Gevaert is considering a Gas Turbine Generator Set with HRSG which shall be used for heat and power production due to the upcoming factory expansion.

Total Scope of the Project

New installation of Gas Turbine Generator Set with GPB80D, 7.440 kWe @ ISO, outdoor installation. Further sound attenuation were needed. Sound emission specifications attached.
Engineering for Balance of Plant, Gas Boost Compressor and HRSG were total scope of supply of Kawasaki Gas Turbine Europe GmbH.

Extract of Special Options

  • 15 ppm L-Gas combustor
  • Air inlet Cooler
  • Stainless steel cladding in front of air filters and filter frames