TurbineGPB60D

Power5.4 MWe

Installation of a GPB60D

Prefab is a company which is fabricating Bricks and prefabricated parts from Concrete for construction of buildings mainly.

The fabrication of Bricks includes “baking” of the bricks in currently 7 Autoclaves (one more will be added in the future). These Autoclaves are currently heated by Steam (12 bar saturated) from regular gas fired boilers.

The Gas Turbine Generator Set and Boiler shall be installed in the existing boiler house, Gas compressor approx 25m away according Romanian rules and regulations.
New Installation of Gas Turbine Generator Set GPB60D, 5.420 kWel @ 10°C, Indoor Installation, Waste Heat Recovery Boiler and Gas Boost Compressor.