TurbineGPB80D

Power7.8 MWe

Show product

Kronos Titan GmbH needs for the production of titan oxide in the plant Nordenham steam as well as electricity. The steam was produced by two steam boilers with natural gas and the electricity was bought from the grid. Because a cogeneration unit was calculated with short ROI, the old steam boilers shall be replaced by two cogeneration plants.